Home / metro / Meralco subsidiary to handle upkeep of MRT-3 power systems

Meralco subsidiary to handle upkeep of MRT-3 power systems

Metro Manila (CNN Philippines) — The Department of Transportation and Communications (DOTC) awarded on Friday (July 3) the sixth of the seven Metro Rail Transit Line 3 (MRT-3) maintenance contracts to MRAIL, Inc., a subsidiary of Meralco.

Related: MRT to tap several firms to handle maintenance

The P43-million contract requires MRAIL to maintain the railway line’s power supply and overhead catenary systems for six months starting July 5.

Related: DOTC awards MRT contracts to two APT Global affiliates

MRAIL will work with five other companies in maintaining the other components of the MRT, namely:

Rail Tracks and Permanent Ways:  Jorgman-Korail-Erin Marty JV

Buildings and Facilities: Global Epcom Services, Inc.

Communication Systems: Trilink Technologies, Inc.

Ticketing System: Future Logic Corporation

Rolling Stocks, Depot Equipment and Signaling: Schunk Bahn-und Industrietechnik GmbH – Comm Builders & Technology Phils. Corp. JV

Related: German-Filipino venture bags P131M MRT upkeep contract

ADVERTISEMENT
Tagged: